MEP sized for medical loads
Medical offices pull more power, move more air and run more plumbing than a standard office, and the systems have to be right the first time. TK Project engineers and installs mechanical, electrical and plumbing in-house, sized to the equipment and use the space will actually carry.
Because MEP is in-house, the systems are coordinated with the build and with cabinetry and signage, so a medical office that's ready to see patients doesn't wait on a trade that isn't.
- Mechanical and electrical engineered for medical equipment loads
- Plumbing designed for exam and treatment areas
- ADA-compliant buildouts worked into the design
- Permit and inspection coordination under one team
Accessibility built in, not bolted on
Medical offices serve patients with a wide range of mobility needs, and ADA compliance has to be part of the design, not a retrofit. TK Project works accessibility into the layout from the start and carries it through permitting and construction.
Frequently Asked Questions
Yes. TK Project engineers and installs mechanical, electrical and plumbing in-house, sized for the medical equipment and treatment loads a medical office requires, coordinated with the rest of the build.
Yes. ADA compliance is worked into the design from the start for medical office buildouts, and carried through permit management and construction, rather than added as a retrofit.